Home/Press Center/Press Releases/2019/Kindergarten for 290 Children Opens in Akkistau, Atyrau Oblast

CPC guarantees efficient and environmentally safe movement of crude oil

The Project is designed to increase the trunk pipeline capacity

Kindergarten for 290 Children Opens in Akkistau, Atyrau Oblast

Kindergarten for 290 children was opened in Akkistau, Atyrau Oblast. Among the participants of the ceremony were Mr. K. Kabyldin, Deputy General Director, RoK Government Relations, CPC-K and Mr. M. Murzyev, Head of Isataisky District.
Construction of the kindergarten valued at more than KZT 600 mln was financed through Caspian Pipeline Consortium-K charity program.
The new kindergarten is a two-storey building of 3,764.4 m². To ensure comfort for the children each room is equipped with tables, chairs and benches, beds, as well as cots and changing tables for the youngest children, cabinets for toys, clothes and sports equipment; TVs for each group of children; games jungle gyms and balls, hula hoops, skipping ropes, badminton sets, teaching aids and computers.
The assembly hall has been provided with a piano, screen, entertainment system with a DVD player and projector, wall-bars, mats and equipment for team games.
The kindergarten also has a medical aid station with all necessary equipment such as rubber bulbs, hot-water bottles, oxygen bags, thermometers, eye test chart, electronic scales, height chart, blood pressure meter, refrigerator and an infrared lamp.
The kindergarten territory comprises 13 shaded playgrounds with toys and games equipment, benches, games tables, sandboxes, tunnel arches, gym ladders, slides, flower boxes, etc.
“The kindergarten was built under the Cooperation Agreement between the Atyrau Oblast Administration and CPC-K” signed in December 2016”, noted Mr. Kabyldin, Deputy General Director, RoK Government Relations, CPC-K.
For reference: during the period of its operation in Atyrau Oblast (since 2000) CPC-K has invested about KZT 9 bln in various large-scale charity projects. 
FYI:
CPC Pipeline System is one of the major investment projects in energy sector with participation of foreign capital in the CIS. The length of the Tengiz–Novorossiysk Pipeline is 1,511 km; it transports over two thirds of all Kazakhstan export crude, as well as crude from Russian oil fields, including the Caspian Region. CPC Marine Terminal is equipped with three Single Point Moorings (SPM) that allow to load tankers safely at a significant distance offshore, also amid poor weather conditions.
CPC Shareholders: Russian Federation (represented by Transneft – 24% and CPC Company – 7%) – 31%; Republic of Kazakhstan (represented by Kazmunaygaz – 19% and Kazakhstan Pipeline Ventures LLC – 1.75%) – 20.75%; Chevron Caspian Pipeline Consortium Company - 15%, LUKARCO B.V. - 12.5%, Mobil Caspian Pipeline Company – 7.5%, Rosneft-Shell Caspian Ventures Limited – 7.5%, BG Overseas Holding Limited - 2%, Eni International N.A. N.V. - 2% and Oryx Caspian Pipeline LLC – 1.75%.