Purchase 19-OD-2023Carrying out full technical inspection of pipeline system underwater crossings "Tengiz — Novorossiysk" through the Urals River (208/217km) Closing date: 31 March 2023 Published: 03 March 2023 Updated: 03 March 2023
Purchase Description The purpose of inspection is - detection of the defects and failure influencing operational reliability of pipeline system underwater crossings (PSUC) without output of oil pipelines from operation, carrying out an assessment of technical condition and drawing up the technical conclusion with recommendations about further operation of pipelines.
Full examination of underwater transitions by the combined methods is conducted in the borders determined by CPC VRD 39.08.2018 "Regulations on maintenance and repair of CPC pipeline system underwater crossings" which sections within the shutoff valves set on coast or at the level of high waters are. Contact Details Attachments
Key Bidder Selection CriteriaFor high-quality execution of inspection the potential contractor should possess experience of similar works, have a possibility of combination of data of various inspections, estimate technical condition of the pipeline and develop recommendations about its rehabilitation.
Existence of the certificate of industrial safety in oil and gas branch.
Existence of the license for the executed types of works (if necessary).
Experience in the field of industrial examination of industrial safety of pipelines not less than 5 years.
Presence of regular non-destructive testing inspectors is not lower than II levels by each type of non-destructive testing (VT, UT, PT, TT, MT, etc.) in the oil and gas industry.
Existence of the accredited laboratory of non-destructive testing.
Existence of own specialized equipment and devices for execution of amount of works according to the present specification.
Presence of the certified divers and the head of diving works.
Presence of the personnel having certificates on the right of management of self-propelled
small size vessels.
Presence of the trained and certified experts of geodetic, hydrological works.
Presence of the trained and certified specialists in corrosion of metals and electrochemical protection.
Existence of quality management system on ISO-9001 is recommended. |
|
Purchase 19-OD-2023Closing date: Published: 03 March 2023 Updated: 03 March 2023
Purchase Description The purpose of inspection is - detection of the defects and failure influencing operational reliability of pipeline system underwater crossings (PSUC) without output of oil pipelines from operation, carrying out an assessment of technical condition and drawing up the technical conclusion with recommendations about further operation of pipelines.
Full examination of underwater transitions by the combined methods is conducted in the borders determined by CPC VRD 39.08.2018 "Regulations on maintenance and repair of CPC pipeline system underwater crossings" which sections within the shutoff valves set on coast or at the level of high waters are. Contact Details E-mail of CPC contact person: A copy should be directed to the address
Altay.Batyrgaliyev@cpcpipe.ru
Attachments
Key Bidder Selection CriteriaFor high-quality execution of inspection the potential contractor should possess experience of similar works, have a possibility of combination of data of various inspections, estimate technical condition of the pipeline and develop recommendations about its rehabilitation.
Existence of the certificate of industrial safety in oil and gas branch.
Existence of the license for the executed types of works (if necessary).
Experience in the field of industrial examination of industrial safety of pipelines not less than 5 years.
Presence of regular non-destructive testing inspectors is not lower than II levels by each type of non-destructive testing (VT, UT, PT, TT, MT, etc.) in the oil and gas industry.
Existence of the accredited laboratory of non-destructive testing.
Existence of own specialized equipment and devices for execution of amount of works according to the present specification.
Presence of the certified divers and the head of diving works.
Presence of the personnel having certificates on the right of management of self-propelled
small size vessels.
Presence of the trained and certified experts of geodetic, hydrological works.
Presence of the trained and certified specialists in corrosion of metals and electrochemical protection.
Existence of quality management system on ISO-9001 is recommended. |
|
All legal entities and individual entrepreneurs meeting requirements set forth in a notice on conduct of a purchase (hereinafter, the “Notice”) are invited to participate in a purchase.
This Purchase is not bidding (tender, auction) pursuant to Articles 447–449 or public tender pursuant to Articles 1057–1061, Part 2 of the Civil Code of the Russian Federation and shall not impose on the Company the obligations set forth by the above Articles of the Civil Code of the Russian Federation.
This Purchase is not contest (tender, auction) pursuant to Articles 910-916 of the Civil Code of the Republic of Kazakhstan and shall not impose on the Company the obligations set forth by the above Articles of the Civil Code of the Republic of Kazakhstan.
The Company shall have the right to cancel the Purchase at any time without explanations, as well as terminate the Purchase without execution of the Agreement upon its results at any time and bear no liability towards Participants or third parties, which may incur losses through such action (including non-reimbursement to the Participants of the expenses borne by the latter due to participation in the Purchase).