On
August 11, 2023, a stone was laid in the village of Glebovskoye, Novorossiysk
Municipality, symbolizing the start of construction of a general practitioner's
office (GPO). The ceremony was attended by Alexey Pelipenko, Regional Manager,
CPC-R Marine Terminal, Valentina Ignatenko, Deputy Minister of Krasnodar Krai
Health Care, Natalya Mayorova, Deputy Head of Novorossiysk City Municipality.The
Caspian Pipeline Consortium allocated approximately 35.4 million rubles towards
design and construction of a GPO building of 286 sq. m. Almost 10 million
rubles more will be allocated by CPC for procurement of state-of-the-art
equipment, including ultrasonic unit. The design provides for two separate
entrances for adults and children, general practitioner’s offices,
pediatrician, procedure room, inoculation physiotherapy rooms, temporary room
(small in-patient facility) and other auxiliary rooms.
The
new GPO, along with the paramedic stations in Vasilievka and Severnaya
Ozereyevka villages, as well as the GPO in Yuzhnaya Ozereyevka village, will be
part of the Novorossiysk Outpatient Clinic No. 1, a state-funded health care
institution of the Krasnodar Krai Ministry of Health Care, and will improve the
accessibility and quality of primary health care for the population. It was
pointed out at the ceremony that, taking into account the geographical location
(Glebovskoye is neighboring with three other villages) and the rapid increase
in the number of residents, about four thousand children and adults will be
able to use medical services here.
As
a reminder: In early summer 2023, three primary health care medical stations
were opened simultaneously in Novorossiysk, these stations being construction
and equipped using the international Consortium’s charity funds.
For
many years, CPC has been supporting the health care sphere in Novorossiysk as
in other host regions. Specifically, using the Company’s charity funds, City
Polyclinic #2 was reconstructed in Novorossiysk, City Hospital No.1, Infectious
Diseases Hospital No. 3, Children's City Hospital, Perinatal Center, Clinical
and Diagnostic Center, and other medical institutions in Novorossiysk were
furnished with modern medical equipment (surgical, anesthesia, resuscitation,
diagnostic, etc.). During the COVID-19 pandemic, CPC rendered aid to
Infectious Diseases Hospital No.3 by providing lung ventilators. Since 2015,
the Consortium has allocated over 300 million rubles towards the city health
care.
For information:
CPC Pipeline
System is one of the major investment projects with foreign capital in energy
sector in the CIS. The length of the Tengiz – Novorossiysk pipeline is 1,511
km. This route transports over two-thirds of all Kazakhstan export crude, as
well as crude from Russian oil fields, including those in the Caspian Region.
CPC Marine Terminal is equipped with three Single Point Moorings (SPM) that
allow to load tankers safely at a significant distance offshore, also amid poor
weather conditions.
CPC Shareholders:
Federal Agency for State Property Management represented by Transneft (trust
management) – 24%, CPC Company – 7%, KazmunayGas – 19%, Kazakhstan Pipeline
Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company – 15%,
LUKARCO B.V. – 12.5%, Mobil Caspian Pipeline Company – 7.5%, Rosneft-Shell
Caspian Ventures Limited – 7.5%, BG Overseas Holding Limited – 2%, Eni
International N.A. N.V. S.ar.l. – 2% and Oryx Caspian Pipeline LLC – 1.75%.