CPC guarantees efficient and environmentally safe movement of crude oil

The Project is designed to increase the trunk pipeline capacity

New Issue of CPC Panorama Is Out

cover eng.jpgThe first 2024 February issue of corporate CPC Panorama is out. 
The results of the last year (which was a record year for the Company in terms of the amount of oil lifted) are published in the infographic format: performance indicators and total volumes of charity projects in Russia and Kazakhstan.

In the pages of the new issue, the topic of expert assessment of technical condition of the commissioned Debottlenecking Program facilities is continued. This time the focus is on the Marine Terminal facilities. Report from PS-4 also covers the DBNP work - in particular, it details the installation of frequency drives (VFD) for 8.3 megawatt electric motors of mainline pump units.

On the eve of the New Year holidays, CPC-R launched the project to replace 400 km of the crude pipeline line pipe. The story about the work progress is illustrated by photographs taken at the replacement sites in the Central Region.

The Minister of Natural Resources and Environmental Protection of Stavropol Krai analyzes the significance of the CPC environmental and education project “Protect Nature of Our Native Land”. The Heads of Astrakhan Oblast and Republic of Kalmykia Governments assess the CPC to Talented Children festival-contest.

The series of publications about the history of the hero-city and the port, which includes CPC Marine Terminal, begins with the three founders of Novorossiysk - one general and two admirals.

CPC employees have many interesting hobbies. Some win seasons of "What? Where? When?”, there are experts in trophy races and tea ceremonies. About all this and much more - in the materials of the CPC Panorama February issue.

The new issue of the corporate magazine is also available in electronic format on the websites www.cpc.ru  и www.cpc-online.ru

For information:

CPC Pipeline System is one of the major investment projects with foreign capital in energy sector in the CIS. The length of the Tengiz – Novorossiysk pipeline is 1,511 km. This route transports over two-thirds of all Kazakhstan export oil, and crude from Russian oil fields, including those in the Caspian Region. CPC Marine Terminal is equipped with three Single Point Moorings (SPM) that allow to load tankers safely at a significant distance offshore, also amid poor weather conditions.

CPC Shareholders: Federal Agency for State Property Management represented by Transneft (trust management) – 24%,  IC CPC Company LLC– 7%, KazMunayGas – 19%, Kazakhstan Pipeline Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company – 15%, LUKARCO B.V. – 12.5%, Mobil Caspian Pipeline Company – 7.5%, Rosneft-Shell Caspian Ventures Limited – 7.5%, BG Overseas Holding Limited – 2%, Eni International N.A. N.V. S.ar.l. – 2% and Oryx Caspian Pipeline LLC – 1.75%.​