
On March 18, 2026, CPC-K completed a charitable project to upgrade five chemistry classrooms in three rural schools. The equipment handover ceremony was attended by the representatives of the CPC-K Government Relations Department, the head of the Education Department of the Atyrau Region Akimat and heads of educational institutions.
Renovated specialized classrooms have been opened at the Essenbai Ageleuov Secondary School in Makhambet village, the Ghibatolla Massalimov Secondary School in Isatai village and the Khamza Sanbayev Secondary School in Makat village. The classrooms have been equipped with measuring instruments, laboratory equipment and sets of chemical reagents. All equipment and furniture are designed for laboratory classes for students in grades 7–11. Using this equipment, students can not only study theory but also conduct full-scale experiments, which is particularly important for students specializing in chemistry and biology. In total, more than 2,800 children attend the schools that have received equipment for their chemistry classrooms.
Since 2001, CPC submits approximately $3 million annually to charitable projects in Kazakhstan. Social projects include construction and reconstruction of schools, kindergartens and medical institutions. Among the 12 recently built facilities are kindergartens in Samal microdistrict and Birlik settlement in Atyrau, in Kulsary town, in Ganyushkino village and Akkol settlement of Kurmangazy district and two kindergartens in Akkistau settlement of Isatai district. Schools were also constructed in Zhastalap settlement of Kurmangazy district, Kurylys settlement of Inder district, Aktogay settlement of Makhambet district, a Youth House and a family type children village in Atyrau.

One of the largest educational projects undertaken by CPC-K in recent years has been the construction of a school for 900 students in the Talgairan micro district in Atyrau. It was opened in 2025. Using charitable funds from CPC, contractors constructed a three-story building with a total area of more than 12,000 square meters. The school has 36 classrooms, each designed to accommodate 25 students. There are also two libraries, medical aid point, two gyms, an event hall and a dining hall. Focus was made on the adjacent area landscaping. Spanning three hectares, the site features a soccer field, running tracks, a tennis court, a volleyball court and an outdoor fitness area.
Photo: Maxim Stadnichenko
For information:
CPC Crude Oil Pipeline System is one of the major projects in CIS energy sector. The length of the Tengiz – Novorossiysk pipeline is 1,511 km. This route transports over two-thirds of all Kazakhstan export oil, and crude from Russian oil fields, including those in the Caspian Region. CPC Marine Terminal is equipped with three Single Point Moorings (SPM) that allow to load tankers safely at a significant distance offshore.
CPC Shareholders: Russian Federation – 24 %, IC CPC Company (LLC) – 7%, NC KazMunayGas JSC – 19%, Kazakhstan Pipeline Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company – 15%, Lukoil International GmbH - 12.5%, Mobil Caspian Pipeline Company– 7.5%, Rosneft-Shell Caspian Ventures Limited– 7.5%, BG Overseas Holdings Limited– 2%, Eni International N.A. N.V. S.ar.l. – 2% and Oryx Caspian Pipeline LLC – 1.75%.