CPC handed over special-purpose vehicles and equipment for municipal institutions of the region in Astrakhan on 10 November 2026. A ceremony of handing over the keys was attended by Nikolay Gorban, CPC General Director, and Igor Babushkin, Astrakhan Region Governor. The charity project is one of the largest in the Astrakhan Region in the company's anniversary year. As a reminder, in 2026, Caspian Pipeline Consortium is marking the 30th anniversary since the signing of the CPC-R and CPC-K founding documents.
The Class B vehicle purchased with funds from CPC will help ensure vehicles used by the Center for Disaster Medicine and ambulance services are replaced in a timely fashion. The special-purpose transport will enable ambulance teams to evacuate patients from remote areas in the Astrakhan Region in a timely manner, will increase the quality of urgent medical help in motor-vehicle accidents, and acute conditions, and will enable ambulance teams to get to patients with acute vascular diseases in time. In 2026, Center of Disaster Medicine and Ambulance teams received almost 150,000 calls, 46% of which were emergencies.
Mini loaders were provided to municipal utility providers in the Enotayevsky, Krasnoyarsky, Limansky, and Kharabalinsky districts. In addition to those, vacuum trucks were purchased for the Enotayevsky and Kharabalinsky districts.
The vacuum tank trucks will be used for watering green spaces and fighting wildfires. The mini loaders with additional equipment will allow to arrange high-quality cleaning of residential areas both in summer and winter. All the purchased special-purpose vehicles are characterized by high maintainability, an extensive service network, and an uninterrupted supply of spare parts.
A fluidizing bed was donated to the N.N. Silishcheva Regional Children’s Clinical Hospital. It is essential for treating patients with extensive burns, as well as children recovering after surgery who must remain immobile for long periods. Using a fluidizing bed is required by standard treatment protocols. It reduces patients' hospital stays by 20% and lowers the risk of post-burn complications.
For information:
CPC Crude Oil Pipeline System is one of the major projects in CIS energy sector. The length of the Tengiz – Novorossiysk pipeline is 1,511 km. This route transports over two-thirds of all Kazakhstan export oil, and crude from Russian oil fields, including those in the Caspian Region. CPC Marine Terminal is equipped with three Single Point Moorings (SPM) that enable safe tanker loading at a significant distance offshore.
CPC Shareholders: Russian Federation – 24 %, IC CPC Company (LLC) – 7%, NC KazMunayGas JSC – 19%, Kazakhstan Pipeline Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company – 15%, Lukoil International GmbH - 12.5%, Mobil Caspian Pipeline Company– 7.5%, Rosneft-Shell Caspian Ventures Limited– 7.5%, BG Overseas Holdings Limited– 2%, Eni International N.A. N.V. S.ar.l. – 2% and Oryx Caspian Pipeline LLC – 1.75%.