A meeting, dedicated to the status of CPC charity projects implementation in 2026 and prospective plans for 2027, took place in the Administration of the City of Novorossiysk Municipality on November 18, 2026. The meeting was attended by Andrey Kravchenko, the Mayor of Novorossiysk; Mikhail Grishankov, CPC Deputy General Director, Russian Federation Government Relations; Novorossiysk deputy mayors, heads of departments of culture, sports, municipal procurement, transport, and others.
The agenda included discussion of construction projects implementation status (soccer stadium in Vasilievka village and the Cultural and Aesthetic Center for Children and Youth in Yuzhnaya Ozereevka) and projects related to health and medicine: purchase of ultrasound machines for the City Hospital No. 1 and the Clinical and Diagnostic Center; x-ray and EEG machines for the City Children's Hospital; replacement of two elevators in the City Hospital No. 2.
CPC charity projects related to transportation include purchase of four school buses for educational institutions and three passenger buses for the municipal vehicle fleet servicing sub-urban routes.
A walk-around was performed at construction sites of Vasilievka soccer stadium and the Cultural and Aesthetic Center for Children and Youth in Yuzhnaya Ozereevka. The three-story building of the Center has an area of over 4,000 sq. m. by design. The first floor will house a checkroom, an assembly hall for 200 seats, a gym, a wrestling hall, a coaching room, sports locker rooms and other auxiliary rooms. On the second floor, the design provides for music class rooms, a museum, a reading room, a reception room, offices of the director and artistic director, and a theater studio and a locker room block. The third floor is dedicated to studios for design, fine arts, early creative development, arts and crafts, photography studio, vocal and dance rooms.
For information:
CPC Crude Oil Pipeline System is one of the major projects in the CIS energy sector. The length of the Tengiz – Novorossiysk pipeline is 1,511 km. This route transports over two-thirds of all Kazakhstan export oil, and crude from Russian oil fields, including those in the Caspian region. CPC Marine Terminal is equipped with three Single Point Moorings (SPM) that enable safe tanker loading at a significant distance offshore.
CPC Shareholders: Russian Federation – 24 %, CPC Company (LLC) – 7%, KazMunayGas JSC – 19%, Kazakhstan Pipeline Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company – 15%, Lukoil International GmbH – 12.5%, Mobil Caspian Pipeline Company – 7.5%, Rosneft-Shell Caspian Ventures Limited – 7.5%, BG Overseas Holdings Limited – 2%, Eni International N.A. N.V. S.a.r.l. – 2% and Oryx Caspian Pipeline LLC – 1.75%.