Home/Press Center/Press Releases/2026/4JV Forum Held in Atyrau

CPC guarantees efficient and environmentally safe movement of crude oil

The Project is designed to increase the trunk pipeline capacity

4JV Forum Held in Atyrau

MAX_0434.jpgOn November 18, 2026, a regular session of the Forum of Tengizchevroil (TCO), North Caspian Operating Company (NCOC), Karachaganak Petroleum Operating B.V. (KPO) and Caspian Pipeline Consortium (CPC) to share best practices in occupational health,  safety and environmental protection (HSE) was held in Atyrau. CPC was the organizer of the annual event attended by 120 participants.
‘The main value of our forum is that it enables open discussion of best practices and their on-site implementation for each company’ - noted N.N. Gorban, CPC General Director, in his video address. ‘It is important to be honest about achieved results, incidents, near misses, and lessons learned. Only this way, through reviewing root causes, we will be able to prevent incidents and preserve human lives and health. Our colleagues’ experience helps us to identify similar risks at our facilities and to take preventive actions in due time.’
The Forum attendees discussed results of 2026 work in the following 11 subgroups: traffic safety, HSE training, incident investigation, environment protection, work safety management systems, CIW projects safety, management of contractors, occupational hygiene, process safety, asset integrity, emergency management.
Representatives of the companies then took part in a business game and elaborated 2027 action plan following the game.
As a reminder: Tengizchevroil (TCO), North Caspian Operating Company (NCOC), Karachaganak Petroleum Operating B.V. (KPO) and Caspian Pipeline Consortium (CPC) are brought together under an agreement to establish the Western Kazakhstan Oil and Gas Cooperation Network. 
CPC is the international project guided by the best world practices and standards. It celebrates its 30th anniversary in 2026. The company is certified in accordance with key quality, environment and labor safety standards in Quality Management System, environmental management, health and safety management system. This status is reconfirmed under supervisory and re-certification audits on the regular basis. Systematic CPC efforts in further development and improvement of the Safety Culture yield notable results as well. As of 2026, CPC Safety Culture, in accordance with the independent audit results, corresponds to the independent level of the Bradley curve, and the Company is confidently moving towards the highest interdependent level.
For information:
CPC Crude Oil Pipeline System is one of the major projects in the CIS energy sector. The length of the Tengiz – Novorossiysk pipeline is 1,511 km. This route transports over two-thirds of all Kazakhstan export oil, and crude from Russian oil fields, including those in the Caspian region. CPC Marine Terminal is equipped with three Single Point Moorings (SPM) that enable safe tanker loading at a significant distance offshore.
CPC Shareholders: Russian Federation – 24 %, CPC Company (LLC) – 7%, KazMunayGas JSC – 19%, Kazakhstan Pipeline Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company – 15%, Lukoil International GmbH – 12.5%, Mobil Caspian Pipeline Company – 7.5%, Rosneft-Shell Caspian Ventures Limited – 7.5%, BG Overseas Holdings Limited – 2%, Eni International N.A. N.V. S.a.r.l. – 2% and Oryx Caspian Pipeline LLC – 1.75%.
Foto: Maxim Stadnichenko