November 25, 2026 – General Director Nikolay Gorban greeted the team of the Eastern Region in the CPC Atyrau office on the occasion of the 30th anniversary since the signing of CPC-R JSC and CPC-K JSC founding documents.
The most distinguished employees received departmental awards to mark this significant occasion. Company Head awarded the “Еңбек ардагері” (Labor Veteran) medal and five “Салаға қосқан үлесі үшін” (For Contribution to the Industry Development) medals, four lapel badges “Мұнай-газ саласының үздігі” (Distinguished Worker of Oil and Gas Industry), eight Certificates of Honor and one Honorary Mention from the RoK Ministry of Energy.
Mr. Gorban handed over to the Regional Manager the diplomas and certificates to be presented to winners and participants of the corporate drawing contest for children ‘CPC is 30’ held on the occasion of the CPC-R JSC and CPC-K JSC founding anniversary. Children of CPC employees, aged 7 to 16, took part in the creative contest. They presented their artwork in three nominations: “CPC is ...”, “Made from oil”, and “CPC’s good deeds”.
Company management jointly with specialists of the Eastern Region discussed preliminary results of the unit operation in 2026 along with plans and future prospects. Employees presented their proposals on improving the Company’s performance and Safety Culture initiatives.
CPC General Director noted that the Eastern Region team was successfully handling all of its current tasks, delivering a full range of equipment and facility maintenance on schedule.
In 2026, every activity at the time of two 12-hour and two 72-hour pipeline shutdowns was completed on time and to a high standard. Third-party audit findings have confirmed compliance of the regional team with the requirements of the international standards of quality and HSE management systems.
The team of the CPC Kazakhstan branch was recognized as the best based on competition results at the corporate Safety Day held in Astana in 2026.
CPC Crude Oil Pipeline System is one of the major projects in the CIS energy sector. The length of the Tengiz – Novorossiysk pipeline is 1,511 km. This route transports over two-thirds of all Kazakhstan export oil, and crude from Russian oil fields, including those in the Caspian region. CPC Marine Terminal is equipped with three Single Point Moorings (SPM) that enable safe tanker loading at a significant distance offshore.
CPC Shareholders: Russian Federation – 24 %, CPC Company (LLC) – 7%, KazMunayGas JSC – 19%, Kazakhstan Pipeline Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company – 15%, Lukoil International GmbH – 12.5%, Mobil Caspian Pipeline Company – 7.5%, Rosneft-Shell Caspian Ventures Limited – 7.5%, BG Overseas Holdings Limited – 2%, Eni International N.A. N.V. S.a.r.l. – 2% and Oryx Caspian Pipeline LLC – 1.75%.