CPC guarantees efficient and environmentally safe movement of crude oil

The Project is designed to increase the trunk pipeline capacity

New Issue of CPC Panorama Is Out

Cover ENG.jpg

The second May 2022 issue of corporate CPC Panorama is out. It opens with a photo report from the construction sites of the Debottlenecking Program. The Program is being implemented in accordance with the project schedule, the mechanical readiness of Tengiz-Novorossiysk pipeline to pump 81.5 mln tons of oil per year will be provided before the end of December. The focus is on the completeness of the supply of equipment, and on components subject to import substitution. 

One of the leading topics of the issue is the implementation of the Safety Culture Leadership Standard. The comments of the DBN group and General Contractor’s representatives are of particular value, they provide insight into the understanding of corporate initiative in teams, the actual status of implementation of leadership practices and staff involvement at construction sites. 

The team of KazTransOil, a 25-year old and long-term reliable partner of CPC, receives congratulations. The Consortium's anniversary celebrants are not left out of the limelight either, their biographies include both operation and scientific achievements. 

Spring is traditionally associated with youth and efflorescence in art. This time the Panorama will tell about the creative successes of the inhabitants of the House of Youth in Atyrau, built by CPC, and introduce its readers to the works of colleagues - poets from Moscow and Astrakhan.

For the opening of the season of auto travel the editorial staff prepared a study of road risks, the study will be useful to readers along with detailed illustrated travel experience of our colleague on the federal highway M-4, which connects Moscow and Krasnodar Krai.

For information:

The CPC Pipeline System is one of CIS largest energy investment projects that involves foreign capital. The length of the Tengiz – Novorossiysk pipeline is 1,511 km. This route moves over two thirds of all Kazakhstan export oil along with crude from Russian fields including those in the Caspian region. CPC Marine Terminal is equipped with three Single Point Moorings (SPM), allowing tankers to be loaded safely at significant distance offshore, including in poor weather conditions

CPC Shareholders: Federal Agency for State Property Management represented by Transneft (trustee) – 24%, CPC Company – 7%, KazMunayGas – 19%; Kazakhstan Pipeline Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company – 15%, LUKARCO B.V. - 12.5%, Mobil Caspian Pipeline Company - 7.5%, Rosneft-Shell Caspian Ventures Limited - 7.5%, BG Overseas Holding Limited - 2%, Eni International N.A. N.V. - 2%, and Oryx Caspian Pipeline LLC – 1.75%.

​​​