
The second May 2022 issue of corporate CPC
Panorama is out. It opens with a photo report from the construction sites of
the Debottlenecking Program. The Program is being implemented in accordance
with the project schedule, the mechanical readiness of Tengiz-Novorossiysk
pipeline to pump 81.5 mln tons of oil per year will be provided before the end
of December. The focus is on the completeness of the supply of equipment, and
on components subject to import substitution.
One of the leading topics of the issue is the
implementation of the Safety Culture Leadership Standard. The comments of the
DBN group and General Contractor’s representatives are of particular value,
they provide insight into the understanding of corporate initiative in teams,
the actual status of implementation of leadership practices and staff
involvement at construction sites.
The team of KazTransOil, a 25-year old and
long-term reliable partner of CPC, receives congratulations. The Consortium's
anniversary celebrants are not left out of the limelight either, their
biographies include both operation and scientific achievements.
Spring is traditionally associated with youth
and efflorescence in art. This time the Panorama will tell about the creative
successes of the inhabitants of the House of Youth in Atyrau, built by CPC, and
introduce its readers to the works of colleagues - poets from Moscow and
Astrakhan.
For the opening of the season of auto travel
the editorial staff prepared a study of road risks, the study will be useful to
readers along with detailed illustrated travel experience of our colleague on
the federal highway M-4, which connects Moscow and Krasnodar Krai.
For
information:
The
CPC Pipeline System is one of CIS largest energy investment projects that
involves foreign capital. The length of the Tengiz – Novorossiysk pipeline is
1,511 km. This route moves over two thirds of all Kazakhstan export oil along
with crude from Russian fields including those in the Caspian region. CPC
Marine Terminal is equipped with three Single Point Moorings (SPM), allowing
tankers to be loaded safely at significant distance offshore, including in poor
weather conditions
CPC
Shareholders: Federal Agency for State Property Management represented by
Transneft (trustee) – 24%, CPC Company – 7%, KazMunayGas – 19%; Kazakhstan
Pipeline Ventures LLC – 1.75%, Chevron Caspian Pipeline Consortium Company –
15%, LUKARCO B.V. - 12.5%, Mobil Caspian Pipeline Company - 7.5%, Rosneft-Shell
Caspian Ventures Limited - 7.5%, BG Overseas Holding Limited - 2%, Eni
International N.A. N.V. - 2%, and Oryx Caspian Pipeline LLC – 1.75%.